Download PDF NRMA Salvage Yard, Smithfield

| Client | IAG Insurance Ltd |
|---|---|
| Architect | Woodhouse and Danks |
| Size | 140m2 |
| Duration | 3 weeks |
This construction of the new car wash bay included:
- portal frames,
- detention tank
- high-pressure water system
In this project we were able to cater for efficiencies and cost savings.
